top of page

Construction from the SIPsCZ building system can be realized throughout the year.

Thanks to the use of a dry construction process, the realization time will be greatly shortened to two to four months. This process is even shorter if the substructure is realized from our system.

ONE TYPE OF CONSTRUCTION

  • base plate

  • roof cladding

  • external walls and partitions

  • staircase

  • ceiling construction

Building system SIPsCZ has a great climate, which is typical for wooden buildings. Due to the dry construction process, no additional unnecessary moisture is created in the construction. This ensures a balanced and healthy indoor climate as soon as the building is finished.

  • Grey Facebook Icon
  • https://www.youtube.com/channel/UCQk
bottom of page